1 Kings 6:9

After Solomon built the Temple and finished it, he covered the Temple with beams and planks made of cedar.

1 Kings 6:14

So Solomon kept on building the Temple and finished it.

1 Kings 6:38

and the Temple was completely finished according to its plans and specifications in the eighth month of the eleventh year of Solomon's reign, that is, during the month of Bul. It took about seven years to build.

Treasury of Scripture Knowledge

Summary

So he built the house, and finished it; and covered the house with beams and boards of cedar.

He built

General references

Bible References

He built

1 Kings 6:14
So Solomon kept on building the Temple and finished it.

General references

1 Kings 6:14
So Solomon kept on building the Temple and finished it.
Ezekiel 40:7
Each guardhouse measured one reed long and one reed wide, and the distance between each guardhouse was five cubits. The threshold of the gate near the vestibule facing away from the Temple entrance measured one reed.

International Standard Version Copyright © 1996-2008 by the ISV Foundation.