1 Kings 6:9
After Solomon built the Temple and finished it, he covered the Temple with beams and planks made of cedar.
1 Kings 6:14
So Solomon kept on building the Temple and finished it.
1 Kings 6:38
and the Temple was completely finished according to its plans and specifications in the eighth month of the eleventh year of Solomon's reign, that is, during the month of Bul. It took about seven years to build.
Treasury of Scripture Knowledge
Summary
So he built the house, and finished it; and covered the house with beams and boards of cedar.
He built
General references
Bible References
He built
1 Kings 6:14
So Solomon kept on building the Temple and finished it.
General references
1 Kings 6:14
So Solomon kept on building the Temple and finished it.
Ezekiel 40:7
Each guardhouse measured one reed long and one reed wide, and the distance between each guardhouse was five cubits. The threshold of the gate near the vestibule facing away from the Temple entrance measured one reed.